1. Before construction, technicians must have an overall construction and installation organization plan for the whole steel structure.
2. Personnel operation arrangement plan for labor and technical personnel before construction.
3. Ensure the traffic safety before entering the site, ensure the smooth access road, and avoid congestion and inability to carry.
4. Temporary arrangement measures for construction. There should also be a relevant communication with the relevant civil engineering party. If there is a problem, it can be communicated in time. Relevant technical arrangements, types of work and production and installation personnel should have a reasonable arrangement and respond positively when they need to be dispatched. If some workers do not follow the relevant scheduling arrangements during the construction process, relevant punishment mechanisms can be formulated. Because it has a great impact on the reputation of the project.
5. Properly manage all tools on the construction site. For the operation of each tool and equipment, there should be relevant operation instructions. Do not operate at will. If there is damage, there should also be an afterwards responsibility to recover.
6. The price and company secrets shall not be disclosed. The relevant staff in the project should maintain a formal information channel for the overall company secrets, do not arbitrarily provoke the relationship with other companies, and keep their words and deeds consistent, otherwise it is easy to violate the rules.