Daily Maintenance of Prefabricated House

Aug 22, 2019

Leave a message

1. After the installation of the color steel prefabricated house, users should not change the structure without authorization, nor disassemble any bolt components, nor add or reduce partitions.


2. Light steel components should be brushed and maintained once in 1-2 years in order to prolong the life of products and maintain beauty.


3. The color steel prefabricated house is connected with the whole building with steel structural parts. Users arrange electric lighting equipment. The wires can not be directly tied to the steel structure. Pipes or slots should be installed in isolation to avoid electric shock.


4. All light steel structure color steel prefabricated house connected by screw are equipped with common power sockets and other facilities. Open line sources should not be installed or hung on the steel framework of color steel houses. Square plastic pipes or slots should be designed to insulate and lay apart to prevent leakage and electric shock.


5. After the production and installation of the color steel prefabricated house, non-professionals should not modify the house structure or circuit design at will. They should not remove the screw or steel frame fittings of the house structure. They should not dismantle the color steel sandwich panel partition wall or add another partition wall. When there is a strong need to increase or reduce partition walls, they should inform us to arrange for professionals. Solve it for you.


6. After leaving the room, we must turn off all the power supply in order to prevent accidents. When using the gas stove, the color steel room can not be too close to the fire source, nor can we use high-power electrical equipment.


7. The frame of the color steel prefabricated house should be painted once or more in 12-24 months under normal conditions, which can prevent the steel frame from rusting and make the color steel prefabricated house beautiful and eye-catching.