Categories

Contact Us

Qingdao KXD Steel Structure Co.,Ltd

We are professionally engaged in steel structure design, manufacture and installation.

Address: Ruiping Center, Hongqi Road, Pingdu, Qingdao, China.

City: Qingdao

State: Shandong

Postal Code: 266700

Country: China

Manager: Andy

E-mail: kxdandy@chinasteelstructure.cn

Tel: 86-532-88336188

Fax: 86-532-85397878

Steel Structure Godown Warehouse

Steel Structure Godown Warehouse

Steel structure godownAdvantages of Steel Structural godown:1).Light weight;2).Short finishing time and low cost;3).Fire proofing and rust proofing;4).Convenient to assemble or disassemble.Technical P

Chat Now

Product Details

Qingdao KXD Steel Structure Co.,Ltd is one of the leading China steel structure godown warehouse manufacturers and suppliers equipped with professional steel structure godown warehouse factory.


Why Choose Us ?

Our company owns a professional sales, design & service team to formulate steel frame building solutions according to user's demand. It also can solve various crane design problems and bring in the best economic benefit for users.

 

When you want to build a prefabricated steel structure portal frame warehouse, we can provide you with many options. You can choose from one of our existing building designs or we can customize one of our steel frame building designs to meet your unique specifications. You can select from an array of layouts, amenities and features to make your steel structural factory meet your every functional and aesthetic need.


Steel structure godown warehouse

Advantages of Steel Structure godown warehouse:

1). Light weight;

2). Short finishing time and low cost;

3). Fire proofing and rust proofing;

4). Convenient to assemble or disassemble.


mmexport1493108533946.jpg


Technical Parameters of steel structure godown warehouse:

1. Main Structure: Steel Welded H Section;

2. Purlin: C Section Channel or Z Section Channel;

3. Roof Cladding: Sandwich Panel(EPS, rock wool, glass wool, PU) or Corrugated Steel Sheet with Fiber Glass Wool Coil;

4. Wall Cladding: Sandwich Panel(EPS, rock wool, glass wool, PU) or Corrugated Steel Sheet;

5. Tie Rod: Circular Steel Tube;

6. Brace: Round Bar;


mmexport1493108527040.jpg

You only tell us the size of the steel structure godown warehouse building(length/width/height), local max wind load, cladding material, we will propose a preliminary scheme asap.

blob.png


FAQ:


1. How to buy your ideal products?

A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.


2. What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 35 working days.


3. How to pack the products?

A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.


4. How to install after the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.


Inquiry

Related Products