Prefabricated Steel Structure Pharmaceutical Workshop

Prefabricated Steel Structure Pharmaceutical Workshop

Compared to other workshop, the cladding of Pharmaceutical Workshop need more strict required. it must be fire proofing. then our engineer design with 75mm PU sandwich panel. A video of posting steel column for your reference
Send Inquiry
Description

 

 

Compared to other genaral steel structure workshop, the cladding of steel structure pharmaceutical workshop need more strict required. it must be fire proofing. for this case, then our engineer design with 75mm PU sandwich panel. due to the limitation of natural lighting and ventilation, the total width of the workshop should not exceed 24m for this steel structure pharmaceutical workshop.

 

The purification workshop cleaning project provides a strict sterile production environment for production and staff, not only eliminating pollutants such as microorganisms and bacteria, but also improving product quality and safety. Each process must be controlled in place, otherwise no matter how good the production process and management, it cannot completely guarantee the quality of the drug.

 

Ceiling: good insulation 50mm PU sandwich panel

Partition: good insulation 50mm PU sandwich panel

Wall panel: good insulation 75mm PU sandwich panel

 

The structural columns of factory buildings are welded H-shaped steel columns, and the roof truss beams are welded H-shaped steel variable cross-section beams. S-shaped cold-formed thin-walled steel purlins are arranged on the roof truss beams. Steel column and foundation are anchored with foot bolts. The floor of steel column in workshop is 150 mm lower than that of indoor floor.

 

mmexport1516324679387.jpg

 

A video of posting steel column on construction site for your reference

 

 

All the installation and connection of steel structures adopt bolt connection mode, among which high strength bolts are used for column-beam connection, beam connection and splicing. Others, such as purlin connection, wind column and roof truss beam connection, use ordinary bolts for corner connection. Horizontal support of roof truss beam is connected by round steel with flower basket bolts, and self-tapping bolts or self-drilling bolts are used to connect maintenance plate and support of maintenance plate.

 

If you are interested in our products. please contact us now.

 

Mr.Andy

Email:kxdandy@chinasteelstructure.cn

Tel:+86 532 85397878

Fax:+86 532 85397878

Mobile/Whatsapp/Wechat:+86 13853233236

Skype:andyyu0074

 

Welcome to tell us your requirement on blank as below.

 

Hot Tags: Prefabricated Steel Structure Pharmaceutical Workshop, China, manufacturers, suppliers, factory, cheap, custom, cost, quotation, prefabricated, furniture workshop design, High quality Steel Structure Workshopds, Pre Engeered Steel Workshop, Steel Structure Furniture Workshop, Pre Engeered Steel Workshop design, Steel Structure Workshop Fabricationds