Steel structure factory building is a kind of building often seen in the early industrial park, which is characterized by short construction period, light weight, large strength, large span and good stability. It can be put into production and use quickly and with high quality. Now many industrial enterprises choose to use steel structure factory building to build their own industrial base or production factory building, but when signing the construction contract with the construction party, it is specific The estimation of construction period has become a key problem. Therefore, the estimation of division period of steel structure workshop will be described below.
For some small-scale steel structure factory buildings, if they are used as temporary operations, they do not need too many structural and architectural requirements, just meet the basic use, so the construction time only needs about half a month, for some large-scale steel structure factory buildings or some buildings that need to be used for a long time, their construction area and structural conditions need to have one If there are some requirements, the construction period will be longer. For example, a 14000 square meter, 16 meter high and local four story steel structure plant can be completed within about 70 days after the actual construction time. Because almost all components of the steel structure workshop can be fabricated, it is also very convenient if they need to be moved and disassembled in the future. Generally speaking, compared with traditional buildings, steel structure workshop has a great advantage in construction time, but the specific construction time depends on the construction area and whether the factory has special requirements.