There will be a lot of construction garbage in the construction process. These garbage mainly comes from the old buildings or repairs demolished by construction workers during the construction process. The main components are dregs, scattered mortar and concrete, bricks, truncated wooden piles, reinforcing steel bars, bamboo pieces and so on. The existence of construction waste not only affects the beauty of the construction site, breaks the corporate image of the construction unit and the city appearance of the city under construction, but also endangers the safety of the life and property of the construction personnel. It is very likely that a major safety production accident will occur, resulting in the loss of personnel and related property.
In order to reduce the damage caused by construction waste and reduce the loss of personnel and property of construction units, many construction companies have constantly strengthened their own safety production management system and formulated very strict treatment procedures for construction waste. The establishment of these systems has played a certain role, but the fundamental reason for the emergence of construction waste is that the construction efficiency has not been improved and construction materials have not been fully utilized, which has resulted in huge waste. It can be said that if the utilization rate of building materials can be improved, not only will enterprises save construction costs, but also will solve the problem of building waste dump which has been plagued by construction units for a long time.