1. Waterproof roll
After the base course is cleaned, the adhesive shall be applied on the reverse side of the coiled material and the base course, pasted and rolled from far to near according to the snapped datum line, and then the joint shall be checked and treated, and the water storage experiment shall be conducted after the completion. According to the different environment and climate of the project site, the container manufacturers will also have certain differences in the thermal insulation materials used. Generally, the walls / ceilings of the container houses designed by the container manufacturers will be decorated with Orson board, gypsum board, cement fiber board, polymer assembly board, aluminum alloy carved board, anti-corrosion wood, etc;
2. Waterproof coating
Take "one cloth and two coats" as an example: after the base course is cleaned, a full brush of paint is applied. After the film is dried, a layer of glass fiber cloth matrix reinforcement material is laid, and a full brush of paint is applied on the flattened surface for fixation. The container manufacturer reminds the drying before the next roof waterproof construction. Polyurethane foam is sprayed inside the container, and glass rock wool board is added to prevent moisture, heat preservation, heat insulation and noise insulation. Indoor air conditioning in the south, floor heating in the north, etc.; reputable container manufacturers strongly recommend that the outer layer be covered with decorative materials, such as Orson board, gypsum board, cement fiber board, polymer assembly board, etc.
3. Laying rigid waterproof layer
The professional container manufacturer said that the construction should be carried out about two days after the completion of the first flexible waterproof layer, mainly with high-grade fatty acid mortar waterproof agent, cement, sand, fine aggregate and fiber as the basic materials, and the thickness of the waterproof layer should be based on the container manufacturer