The processing plants we often see are mainly steel structures. During our use, is the edge cover work of steel structure plants also very important? Let's take a look at it below.
The edge cover of steel structure workshop mainly includes gable hemming, door, window hemming, eave hemming, canopy hemming, etc. among them, the sealing of door and window trimming is important. In general, water leakage of steel structure workshop occurs in door and window trimming. If the first sealant is not well sealed, the later maintenance is very difficult, because the wall style is quite small, its selection and installation is also slightly less than that of the door, and attention should be paid to the tightness Sealing property to prevent water from entering. Under normal conditions, the seam of the door leaf is 1.5-25mm, too small and too tight to open, too large and poor sealing.
In the process of installation, it is necessary to pay attention to whether the door leaf can be turned on and off automatically, whether it can be vertical, whether there are signs of self opening and self closing, and whether the seam between the door leaf and the bolt frame and the ground can meet the installation requirements. If there are any factors, they shall be dealt with in time.
After the installation of the metal parts of the steel structure door leaf, the edge wrapping and the wall panel shall be sealed. The side of the door leaf can be placed in the door bolt, so that the other half of the hinge of the door leaf flows in the hinge slot of the door bolt to realize the installation of the door leaf. However, if it is a practical door, it can indirectly install the door leaf in the position corresponding to the door frame plate, and then use the straight plate line or other lines as the door line (also known as the door, door partition or door stop), and use headless nails to flow it in the door frame plate, so as to ensure the accurate position when opening the door leaf.



