Categories

Contact Us

Qingdao KXD Steel Structure Co.,Ltd

We are professionally engaged in steel structure design, manufacture and installation.

Address: Ruiping Center, Hongqi Road, Pingdu, Qingdao, China.

City: Qingdao

State: Shandong

Postal Code: 266700

Country: China

Manager: Andy

E-mail: kxdandy@chinasteelstructure.cn

Tel: 86-532-88336188

Fax: 86-532-85397878

Prefabricated House Worker Camp

Prefabricated House Worker Camp

Stee houseTechnical Parameter:Technical Parameter of standard prefabricated house:1.Wind resistance: Grade 11(wind speed≤ 120km/h)2.Earthquake resistance: Grade 73.Live load capacity of roofing: 0.6kn

Chat Now

Product Details

Qingdao KXD Steel Structure Co.,Ltd is one of the leading China prefabricated house worker camp manufacturers and suppliers equipped with professional prefabricated house worker camp factory.


With a hard-working excellent team and harmonious wording atmosphere, our products are more and more perfect and diversified, not only beautiful in appearance, but also practical in marketing. 

Production:

cut off, cutting, welding, steel roll, steel tube, panel, warehouse, loading


Application :

construction site, mining & oil, military camp, temporary office, school, disaster relief& shelter, exhibition & temporary  house, scenic spot, holiday house, backyard granny flats



Technical Parameter:

Technical Parameter of standard prefabricated house:

1.Wind resistance: Grade 11(wind speed≤ 120km/h)

2.Earthquake resistance: Grade 7

3.Live load capacity of roofing: 0.6kn/m2

4.External and internal wall heat transmission coefficient: 0.35Kcal/m2hc

5.Second Floor Load Capacity: 150 kg/m2

6.Live load of corridor is 2.0kn/ m2

7.Wall permitted loading: 0.6KN/ m2

8.Ceiling Permitted live loading: 0.5 KN/m2

9.Wall Coefficient of thermal conductivity: K=0.442W/m2k

10.Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K

Packing:

1. CKD(Complete knocked down) wall panels system. That means completely knocked down& be loaded into container.

2. Flat packed into standand shipping container; One 40HQ container can load 6~8 units.

3. Wholly load as a unit.

   

Installation instruction:

1.Put the chassis levelled,put the columns on the corner,align the holes for screws,screw from the upsides

2.Put the roof on the columns,align the holes for screws,screw from the downsides

3.Firstly install the long side wall panels, Lean the wall panels into the house

4 Fix all the wall panels

5 Install the internal decoration

6 Install the decoration rib on the roof

7.Install the baseboard




Our Services

1.Professional design and engineering team: Full solution for site camp design. We could make the design for whole camp as per your requirement. 

2.Procurement and Manufacture for all material for prefabricated building. We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology. 

3.Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.



Our Services
1. Professional design and engineering team: Full solution for steel structure design.
2. Procurement and Manufacture for all material for prefabricated building. We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision, We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK. 

Related Products

Inquiry